Home Contact Us Site Map
FAIL (the browser should render some flash content, not this).
 
  What Clients Say - Case Studies (MMC)  
Prow detail during Construction

KING EDWARD’S COURT, WINDSOR - Modular

LA Elwell, in conjuction with our client Bristol-based Metek Building Systems made and supplied all the steel used in the innovative framework of King Edward’s Court, Windsor.

The building occupies a prestigious site next to Windsor Royal Station and has been completely rebuilt to create a spacious public concourse and modern shopping area.

The structure of the “island” forming a major shopping area was constructed as a long span steel frame, including long cellular beams for the top floor.

From the 5th to 9th floors a new Travelodge hotel is located built entirely in light steel framing, using LA Elwell materials.

The load bearing light steel framing was manufactured by LA Elwell and installed by Metek UK in just four months.

A new way of building for the residential and hotel sectors, the £0.5 million light steel framing contract is one of the largest of its kind for our client Metek.

 

< Back to Case Studies listing

 
Roof Panels being installed
LA Elwell Limited
Cable Street
Wolverhampton
WV2 2HX

t. (01902) 871111
f. (01902) 871117
e. sales@laelwell.com
   
Pheonix Street
West Bromwich
West MIdlands
B70 0AQ

t. (0121) 553 4274
f. (0121) 553 4272
e. sales@laelwell.com
Home Contact Us Site Map News Who We Are What We Do Our Products What Clients Say Industry Links T & C’s/Disclaimer Top of Page Valid HTML 4.01 and CSS